Migrating a Joomla site to new hosting scares many owners: it seems that the site will be unavailable for several days. In fact, with proper organization downtime can be minimized — from 30 minutes to a couple of hours. We have migrated more than 80 sites to new hosting and we know how to do it unnoticed by visitors. Let us look at it step by step.

Preparing for the Migration

Before starting the migration:

  • Make a full backup of the files and the database.
  • Check the new hosting for compliance with Joomla requirements.
  • Make a list of all domains and subdomains.
  • Prepare access to the DNS panel.

Preparation takes more time than the migration itself, but it is what guarantees success.

Migrating the Files

The site files are transferred to the new server:

  • Upload the files via FTP or a file manager.
  • Preserve the directory structure.
  • Check that all the files are fully uploaded.
  • Make sure the access permissions are correct.

It is important not to lose a single file — the operability depends on it.

Migrating the Database

The database is the second half of the site:

  1. Make a database dump on the old hosting.
  2. Create a new database on the new hosting.
  3. Import the dump.
  4. Check the encoding and data integrity.

After the import, update the credentials in the configuration.php file.

What to Check After the Migration

A mandatory checklist:

  • The site opens correctly.
  • The admin panel works.
  • The database is connected.
  • The forms and components work.
  • The images load.

Switching the DNS

When the site on the new hosting is ready, switch the DNS:

  • Change the A record to the new IP address.
  • The DNS update takes from several hours to a day.
  • During this period the site may be available either on the old or the new server.
  • Do not disable the old hosting until the DNS update is complete.

A gradual switch allows you to avoid downtime.

What to Do After the Switch

After the DNS change:

  • Check the site from different devices and networks.
  • Make sure the forms are submitted.
  • Check the email if it is tied to the hosting.
  • Monitor errors for several days.
  • Disable the old hosting only after 2–3 days.

Do not rush to delete the old site: if something goes wrong, you will have a fallback.

"Migrating without downtime is not magic but the right sequence: preparation, migration, checking, switching."

If you are planning a hosting change and want to avoid downtime — we have a ready-made Migration to Another Hosting service: usually 1 day, downtime no more than 1 hour. And if you also need to update Joomla — that is Joomla Update: 3 → 4 → 5 → 6 without data loss.